Monthly Archives: February 2010

26FEB2010

installed deck rail for clients then came home. hung some rock. turned lots of screws. one pan of mud and six feet of tape. gonna finish watching ‘you, me & dupree’ then get some rest. it’s already 12:30am saturday. i’ve … Continue reading

Posted in Uncategorized | 1 Comment

25FEB2010

finished placing screws in lid tonight. lots to turn tomorrow. spirits are very low right now. don’t want to do this anymore. but will keep moving forward and get this done. hoping for blow-in tomorrow. might have to wait until … Continue reading

Posted in Uncategorized | Leave a comment

24FEB2010

Finished framing in the attic today. Did a lot of clean-up and had a visit from the bank (they send a guy to take pictures and ask questions). Bought electrical trim. Not happy that code changed and now all receptacles … Continue reading

Posted in Uncategorized | 1 Comment

23FEB2010

Last night’s project: frame attic floor before blow-in insulation is shot. Insulation will be 16″ deep for R-38. Thought it would be easier to install joists now rather than crawling around knee-deep in “cotton” later.

Posted in Uncategorized | Leave a comment

22FEB2010

We are 99% finished hanging our drywall. Looks like we’ll have enough insulation and drywall left over to finish the two exterior garage walls, the basement bathroom interior, the storage closet under the stairs (which is required by fire code), … Continue reading

Posted in Uncategorized | Leave a comment

16FEB2010 – 4 Pics

Posted in Uncategorized | 1 Comment

15FEB2010

Collin and I hung rock for almost 13 hours today. Got a lot done but very sore. Didn’t get the clean-up done so no photos tonight.

Posted in Uncategorized | Leave a comment