Monthly Archives: August 2010

2010-08-27

Steve packed our shower pan tonight. Collin and I mixed. Looks really good. Custom hand-packed mud pan usually runs at least $500. This was a very nice favor! I’m forming a concrete shower curb. White subway tiles on shower walls. … Continue reading

Posted in Uncategorized | Leave a comment

2010-08-22

working on our “punch list”–a term heard often in construction. It means the list of things left to finish a job such as cover plates, towel bars, light bulbs, fix problems, etc. built the front porch stairs. finished some electrical … Continue reading

Posted in Uncategorized | 1 Comment

2010-08-18

Posted in Uncategorized | 1 Comment

Car Pet

Posted in Uncategorized | Leave a comment

2010-08-07

Laid Wonderboard in master bath. Installed pocket doors in master bath and master closet. Trimmed all master bedroom and master closet. Tomorrow trimming office and guest bedroom. Wednesday morning carpet guy is installing. Will upload pics then.

Posted in Uncategorized | Leave a comment

2010-08-02

Posted in Uncategorized | Leave a comment