Monthly Archives: March 2011

Update

Just formed and packed concrete shower curb cap. Neighbor built a fence yesterday splitting our lots. Waiting for the ground to dry out so we can drive the truck down our hill into the back yard. Still have several large … Continue reading

Posted in Uncategorized | Leave a comment

The Long Wait and More

Can hardly believe we’re still waiting for this mortgage to go through. Process was begun on 7 November last year. It’s now over four months of mostly waiting. How could it possibly take this long? Meantime the bank keeps collecting … Continue reading

Posted in Uncategorized | 1 Comment

small project

building this rolling work bench. still need to wrap top edge with hardwood and drop in quarter-inch melamine top. so far cost is about $105. this one is 4′ x 8′. i’m making another one that is only 4′ x … Continue reading

Posted in Uncategorized | 1 Comment